Mon. Feb 17th, 2025

News – Russian Government


Since 2018, Russia has been implementing the “Stimulus” program, thanks to which schools, kindergartens, medical institutions, highways and housing and communal services facilities have been built for new residential areas in the regions. Since 2019, the program has been included in the national project “Housing and Urban Environment”, which completed its operation in 2024.

Road in the Novo-Patrushevo microdistrict of the city of Tyumen

Road in the Novo-Patrushevo microdistrict of the city of Tyumen

“It is important for people that there is a modern school, kindergarten, and clinic near their house within walking distance, that the yard can be accessed via a high-quality road, and that utilities are supplied without interruption. All this was facilitated by the Stimulus program, thanks to which more than 1,000 activities have been implemented in the country since 2018, including 848 infrastructure facilities and 169 technical connections. This made it possible to stimulate the commissioning of 61.4 million square meters. m of housing provided with the necessary infrastructure. The national project “Housing and Urban Environment”, and along with it the “Stimulus” program, have completed their work, but we continue to improve the living environment for people within the framework of the new national project “Infrastructure for Life”,” said Deputy Prime Minister Marat Khusnullin Marat Khusnullin.

The Deputy Prime Minister added that during the “Stimulus” program, about 1,600 km of roads were built and reconstructed. Among them are inter- and intra-block roads, access roads, interchanges, as well as main streets that are important both for the city as a whole and for individual districts. In addition, the Stimulus program made it possible to commission 203 educational facilities with more than 111 thousand places, 12 medical institutions with 5.5 thousand places, as well as utility networks with a length of more than 2 thousand km.

“In 2024 alone, 124 objects were put into operation in the territories of housing projects participating in the activities of the Stimul program. This stimulated the commissioning of 11.75 million square meters of new housing in developing areas. 51 engineering infrastructure facilities with a length of more than 450 km, 70 road infrastructure facilities with a length of more than 132.3 km and three schools with 3,129 places were created or reconstructed,” noted the Minister of Construction and Housing and Communal Services of the Russian Federation Irek Fayzullin.

Related Post