Construction of the Dyurtyuli – Achit highway
Construction of the Dyurtyuli – Achit highway
Construction of the Dyurtyuli -Achit highway
In Russia, large -scale work on the construction of the Dyurtyuli -Achit highway continues. The new highway with a length of 275 km will be part of the continuation of the M-12 Vostok highway to Yekaterinburg and will pass through the territories of three regions. To date, its readiness is about 85%, said Deputy Prime Minister Marat Khusnullin.
“The construction complex of Russia is conducting systematic work to increase the connectedness of the regions of our large country. From individual sections, unified, including high -speed, paths are created. The transport route “Russia“ will stretch about 12 thousand km from St. Petersburg to Vladivostok. It will include both existing routes and built from scratch. One of these is the M-12 Vostok highway, the construction of which is carried out on behalf of the president. On one of its sections, the new Dyurtyuli -Achit road, construction work continues in full swing. In general, the total readiness of the highway is about 85%, ”said Marat Khusnullin.
The Deputy Prime Minister said that the readiness of the section of the highway with a length of 140 km in Bashkiria is 72%, work here is carried out around the clock. In the Perm Territory, 92 km of the future highway are ready by 82%. Today, the road workers completed the reconstruction of engineering communications, continue to strengthen the drainage ditches and cones of artificial structures with monolithic concrete, as well as slopes of the subgrade and riverbeds. In parallel with this, platforms are prepared for future multifunctional zones of the road service. The third stage in the Sverdlovsk region is 42 km long in a high degree of readiness. Work is underway on the installation of mesh fencing and laying of fiber-optic communication lines.
According to the head of the state -owned company “Avtodor” Vyacheslav Petushenko, a total of 99 artificial structures, including overpasses, bridges and bio -transitions, are provided for the construction of 99 artificial structures.
“There will be 56 artificial structures on the road section in Bashkiria, the largest and most complex of which is the bridge over the White River with a length of more than 813 m. In the Perm Territory, 31 buildings are built, including seven bridges. Among them, one can note the bridge over the Malaya Sarana River with a height of more than 24 m, which is comparable to the eight -story building. In the Sverdlovsk region, all 12 artificial structures are completely ready. The most long and technically complex of them became a bridge over the river a large saran 525 m long. It relies on eight supports, the height of which reaches 57 m, ”said Vyacheslav Petushenko.