Tue. Sep 16th, 2025

News – Government of Russia


Marat Khusnullin: At the round of Adler, concreting of a reversal loop began

Marat Khusnullin: At the round of Adler, concreting of a reversal loop began

In the Krasnodar Territory, the implementation of a large -scale project for the construction of Adler’s detour is ongoing. Currently, the road workers have begun monolithic work on the aboveground part of the reversal loop as part of the future interchange from the eastern side of Adler’s bypass in the village of Vysokoye. This was announced by Deputy Prime Minister Marat Khusnullin.

“The south of Russia has a huge economic potential. The development of the traffic complex of the region opens up new opportunities to improve people’s living conditions and increase transport accessibility, and also becomes a driver of the growth of a number of sectors of the economy, including domestic tourism. As part of the modernization of the road network in the south of the country, we are building a bypass of Adler. The new road will reduce the travel time to the airport of Sochi and Krasnaya Polyana, and will also ensure the withdrawal of transit transport from the resort zone, which will create comfortable conditions for local residents and tourists. Currently, the builders have begun the construction of the aboveground part of the reversal loop in the future interchange from the eastern side of Adler’s bypass in the village of Vysokoye. After completion of the work, guests and residents of Sochi, when moving along the A-149 highway from Adler, will be able to use this reversal loop for a comfortable congress to go around Adler and towards the old Krasnopolyansky highway to travel in the direction of Sochi Airport, the village of Moldovka, the High and other nearby settlements, ”said Marat Khusnullin.

The Deputy Prime Minister added that in total there will be nine congresses in the eastern denouement, so the motorists traveling in any direction will be able to call into the tunnel of Adler’s detour, leading to Kudepstast. And those who arrived through the tunnel from the center of Sochi will be able to turn onto the old and new Krasnopolyanskoye highway for movement towards Krasnaya Polyana, Sochi Airport and Adler.

According to Vyacheslav Petushenko, Chairman of the Board of the Avtodor State Company, the concreting of the reversal loop will take place in stages, according to the grips.

“To concrete the first span, 274 cubic meters of high -strength concrete of a total mass of about 685 tons were used. For the construction of the entire reversal loop, about 1.9 thousand cubic meters will be required. m concrete. After the construction of the overpass 362 and a width of 7.9 m in the eastern part of the future multi-level interchange of the bypass of Adler, the high-speed direction of the A-149 highway and the Mzymta River, will be completed. It will be held by 12 supports, the construction of which has already been completed, ”said Vyacheslav Petushenko.

Related Post