Wed. Jul 23rd, 2025

News – Government of Russia


Thanks to the national project “Infrastructure for Life”, sections of regional and local roads are also brought to normative state – entrances to villages, settlements, villages, etc. In 2025, it is planned to update 520 entrances to small settlements with a total length of more than 3 thousand km. This was announced by Deputy Prime Minister Marat Khusnullin.

“Convenient road entrances to small settlements directly affect the quality of life. Such roads improve the availability of medical care, education, jobs and stores, stimulate the development of local business and agriculture, and also improve social ties. High -quality routes contribute to the influx of tourists, investments and new opportunities, which ultimately helps to maintain the number of residents and stop the outflow of youth in large cities. In 2025, according to the national project “Infrastructure for Life,“ We plan to put in order 520 entrances to villages, villages, villages and small cities are over 3 thousand km of the regional and local road network, ”said Marat Khusnullin.

Minister of Transport Andrei Nikitin noted that the development of roads in the village is one of the key areas of the road workers. According to the data at the end of 2024, the length of public roads of local importance passing through rural areas is 776.1 thousand km, of which 406.7 thousand km with solid coating. “To ensure the sustainable growth of the country’s agricultural sector and improving the quality of people’s life in rural areas in Russia, the state program“ Complex development of rural territories „is being implemented. Thanks to it in 2025, about 338 km of roads that provide access to settlements and agricultural enterprises,” said Andrei Nikitin.

So, in the Tula region a section of the Tula -Belev highway is repaired – the entrance to the village of Dubna. The road provides access to the Mosolov manor with the park, the temple of Peter and Paul, as well as to the site of the annual festival “Orthodox Dubna”, which attracts numerous guests.

On the area with a length of 3 km, the asphalt concrete coating was already completely replaced, the roadsides were strengthened with crushed stone material, and crops, stopping and landing sites were restored. In parallel on the national project, road work is carried out in the village itself. The length of the repair areas is over 2 km.

In the Republic of Mari El, after repair, the entrance to the village of Markelovo was put into operation. The length of the object is 2.5 km. The road leads to socially significant objects that are located in the administrative center of the Novotorsalsky district. In total, 14 such objects with a total length of 97.5 km will be upheld in the region.

In the Samara region this year, about 160 km of roads connecting small settlements with district centers and key highways will be commissioned. In total, 15 sites leading to 25 villages and villages will be upheld.

For example, in the Krasnoarmeysky district, 5.4 km of Samara – Volgograd -Pestravka – Lenin – Kochetkovsky – Butkovsky is overhaul. This is the only route connecting the villages of Butkovsky and Sofinsky with a regional network of roads. In addition, this is the way to the main social objects of the village of Leninsky, which includes these settlements. This is also part of the school settlement. route.

In the Susaninsky district of the Kostroma region, an entrance to the village of Medvedka with a length of 3.2 km leads to a normative state. The road connects the settlement with the regional highway of Kostroma – Susanino – Bui and allows residents to get to the district and regional centers. The school bus route also takes place here. In addition, the entrance ensures the transport accessibility of the tourist facility in the bear – the oldest stud farm, which was founded in 1891 by the merchant Skalozubov.

Related Post