Federal highway R-297 Amur Chita-Khabarovsk in the Trans-Baikal Territory
Federal highway R-297 Amur Chita-Khabarovsk in the Trans-Baikal Territory
Federal highway R-297 Amur Chita-Khabarovsk in the Trans-Baikal Territory
On the federal highway of the R-297 Amur Chita-Khabarovsk in the Trans-Baikal Territory, work was completed to bring into the normative state of four sections of the road with a total length of 30 km. This was announced by Deputy Prime Minister Marat Khusnullin.
“This year marks the 15th anniversary of the day when the traffic along the federal highway of the R-297“ Amur “. This is the only route between two large transport hubs and administrative centers of the country’s regions-Chita and Khabarovsk. As a continuation of the R-258 federal highway“ Irkutsk-Ulan-Ude-Chita, the road connects the western part of Russia with the Far East, as well as also It provides an exit on the A-360 highway “Lena“ to Yakutia and the Magadan region. Of course, any road surface requires care and timely update. And so that the road of motorists remains comfortable, the R-297 of a total length of 30 km was completed repairs-the road surface was renewed, the water supply pipes were renovated, and also restored them to restore Barrier fence, signaling columns and road signs, ”said Marat Khusnullin.
The work was carried out in three state contracts in the areas: km 115-km 125 near the village of Naryn-Talach in the Karymsky district, km 270-km 275 and km 295-km 297, as well as km 323-km 337 in the Chernyshevsky district.
Additionally, on the 323 – km 337 section near Zharen, the recreation area was updated and the sunscreen to the prevention of the appearance of drawdowns or the so -called Amur waves, which are formed as a result of thawing eternal -free soils at the base of the road.
“The federal road“ Amur “is one of the most important elements of the Russian transport system. The average annual intensity of traffic on this highway is growing every year. So, in 2022 it amounted to about 2.5 thousand cars a day, and in 2024 it was already more than 3.2 thousand vehicles. That is why we are constantly working on the improvement of the transport characteristics of the road, including with the use of innovative Technologies and materials that allow you to increase the durability and safety of the route, ”said the head of the FCU“ Uprdor “Trans -Baikalia”, who was repaired the track, Azamat Ilambetov.
Work on bringing the route to normative state continues. By the end of 2026, on the R-297 Amur highway, it is planned to repair more than 138 km (including 30 km already introduced by the Amur Region with the Amur Region). This year it is planned to put into operation a total of 84 km.